Client
Pliva d.d. (Teva group member)
Roles in the project:
About project
The project was conducted during the employment with Klimaoprema d.d.
Leading role in the project regarding the design of the HVAC system for the cleanroom according to the GMP guideline.
It is a project of an existing building that was reconstructed and upgraded for production purposes API.