Client
Alkaloid Skopje
Roles in the project:
About
The project was conducted during the employment with Klimaoprema d.d.
Leading role in the project regarding the design of the HVAC system for the cleanroom according to the GMP guideline.
For this project the existing building was reconstructed and upgraded for the needs of the production of pharmaceutical products.